Duration
April 2019 – May 2021
Location
Kuala Lumpur
Duke Phase 3 Section 4- Setiawangsa to Melati
Contract Sum
Rm 25.3 Million
Client
Ekovest Construction Sdn Bhd
The project undertaken by Ekovest Construction Sdn Bhd involves bridge structural works within the context of the Setiawangsa-Pantai Expressway (SPE) - Duke Phase 3 Section 4 development, spanning from Setiawangsa to Melati. The project scope specifically encompasses the construction and completion of bridge structure works for Interchange No. 5, which includes ramps 5G/P1-P14. The bridge structural works refer to the design and construction of the bridge components required for the specified interchange. These bridges play a vital role in connecting the various ramps within the interchange, ensuring smooth traffic flow and efficient movement between different parts of the expressway. The project has an allocated budget of RM 25.3 Million, and the project timeline extends from April 2019 to May 2021. Through this endeavor, Ekovest Construction contributes to enhancing the transportation infrastructure and connectivity along the Setiawangsa-Pantai Expressway, improving traffic flow and accessibility for commuters in the Setiawangsa to Melati corridor.