The MMCEG-Gamuda Joint Venture with PTC undertook a construction and completion project with a contract value of RM 0.8 Million. This project took place from August 2003 to October 2003 and involved the construction of the MS04 U-Section base at KL Seremban for South Ingress/Egress. This work was carried out as part of the Proposed Stormwater Management and Road 'Tunnel (SMART) Project under Contract No D6-5-001. This joint venture between MMCEG and Gamuda played a crucial role in enhancing stormwater management and road infrastructure, contributing to improved urban development in the designated area.