Duration

August 2006 – March 2007

Location

Kuala Lumpur

KL International Airport, Sepang, Malaysia

Contract Sum

RM 0.9 Million

Client

Road Builder (M) Sdn Bhd

In Kuala Lumpur, at KL International Airport in Sepang, Malaysia, the project involved the proposed design, build, testing, and commissioning for upgrading for new large aircraft (A380) operations. Specifically, it focused on terminal building renovation and upgrading works related to airside facilities. The scope of work included rigid pavement works. Pembinaan Thin Chai Sdn.Bhd partnered with Road Builder (M) Sdn Bhd for this project, which took place from August '06 to March '07.