Duration

December 2005 – June 2006

Location

Kuala Lumpur

Sg Kerayong Phase II

Contract Sum

RM 6.2 Million

Client

MMCEG-Gamuda Joint Venture

Certainly! In Kuala Lumpur, at the Sg Kerayong Phase II location, a comprehensive bridge construction project was undertaken. The project, managed by Pembinaan Thin Chai Sdn.bHD in collaboration with MMCEG-Gamuda Joint, encompassed various sections. It included building a bridge from Chainage 42.568 to 15.308 with a length of 107.74 meters at BP Island, another spanning from Chainage 392 to 437.50, covering 45.50 meters, and involving a Cross Passage. Additionally, there was a bridge constructed from Chainage 195.025 to 281.128, extending 175.51 meters at MS 03 U-Section. The entire project, valued at RM 6,240,185.98, was successfully completed between December '05 and June '06, contributing to infrastructure development in the region. The RC works include the construction of the bridge structures, which are crucial components of road networks, providing pathways for vehicles to cross over various obstacles such as rivers, other roads, or elevated terrains. The allocated budget for these bridge construction works is RM 20,499,982.00. The project commenced in November 2011 and was completed by July 2013. Through this initiative, Road Builder (M) Sdn Bhd contributes to the enhancement of road infrastructure in Kuala Lumpur, improving transportation efficiency and connectivity for the residents and commuters in the area.