Proposed 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor.
GET IN TOUCH

Duration

September 2004 – September 2005

Location

Johor Darul Takzim

Tanjung Bin, Johor

Contract Sum

RM 6.7 Million

Client

AKM Sdn Bhd

The "Proposed 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor" project in Johor, Malaysia, involved the construction of critical infrastructure for a coal-fired power plant. Specifically, it encompassed the construction of a cooling water intake system, a pump pit, and an offshore discharge culvert. The project was undertaken by AKM Sdn Bhd and was carried out from September 2004 to September 2005. The total contract value for this portion of the project was RM 6.7 Million. These infrastructure components are essential for the efficient and safe operation of a coal-fired power plant, which generates electricity by burning coal to produce steam and drive turbines. The cooling system helps manage the temperature of the equipment and ensures optimal performance.