Proposed 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor.
Proposed 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor.
GET IN TOUCH
Duration
September 2004 – September 2005
Location
Johor Darul Takzim
Tanjung Bin, Johor
Contract Sum
RM 6.7 Million
Client
AKM Sdn Bhd
The "Proposed 3 x 700MW Coal Fired Power Plant at Tanjung Bin, Johor" project in Johor, Malaysia, involved the construction of critical infrastructure for a coal-fired power plant. Specifically, it encompassed the construction of a cooling water intake system, a pump pit, and an offshore discharge culvert.
The project was undertaken by AKM Sdn Bhd and was carried out from September 2004 to September 2005. The total contract value for this portion of the project was RM 6.7 Million. These infrastructure components are essential for the efficient and safe operation of a coal-fired power plant, which generates electricity by burning coal to produce steam and drive turbines. The cooling system helps manage the temperature of the equipment and ensures optimal performance.