Duration

October 2009- October 2011

Location

Ipoh and Padang Besar

Contract Sum

RM 34.5 Million

Client

MMC-Gamuda JV

The Electrified Double Tracking Project between Ipoh and Padang Besar continues to showcase significant infrastructure developments. In this case, the focus is on the construction of two bridges, specifically denoted as ROB10 and ROB12. These bridges are part of the rail network's expansion and enhancement efforts. The joint venture collaboration between MMC and Gamuda, known as MMC-Gamuda JV, is responsible for overseeing this construction. The budget allocated for the construction of these bridges is substantial, amounting to RM 34.5 Million. The project timeline spans from October 2009 to October 2011, signifying the comprehensive scope of the work involved. These bridges, referred to as Road Over Bridges (ROBs), are vital components of the electrified double tracking project. They enable the railway system to cross over roads and other transportation routes smoothly, ensuring both rail and road connectivity. By executing these bridge constructions, MMC-Gamuda JV significantly contributes to the success of the broader project, fostering improved transportation links, reduced travel times, and enhanced connectivity between Ipoh and Padang Besar.