The "Construction of Malut Dam at Pulau Langkawi" project in Kedah Darul Iman, Malaysia, involved the construction of various critical components for the dam. These components included a 250-meter-long transfer tunnel, water intake infrastructure, outfall structures, and a spillway. These elements are essential for the proper functioning and management of the dam, including water intake, outflow, and flood control.
This project was carried out by Pembinaan Thin Chai Sdn Bhd in partnership with Sato Kogyo Co., Ltd. The project took place between 1984 and 1986 and had a total contract value of RM 5.5 million. Dams like Malut Dam play a crucial role in ensuring a stable water supply, flood prevention, and environmental management in the region where they are constructed.