Duration

June 2005 – July 2006

Location

Selangor Darul
Ehsan, alan Balakong/Lebuhraya Sungai Besi Dan Persimpangan Mines Resort/Jalan Balakong

Contract Sum

RM 11.6 Million

Client

Road Builder (M) Sdn Bhd

The project focuses on various reinforced concrete works at Ramp A, Ramp B, and Ramp D, with additional Variation Orders (V.O.) for specific enhancements. The collaborative efforts of Road Builder (M) Sdn Bhd and PTC aim to improve and construct key infrastructure components. The project includes the following aspects: Reinforced Concrete Works at Ramp A, Ramp B, and Ramp D: The primary objective is to execute reinforced concrete construction at Ramp A, Ramp B, and Ramp D. These constructions likely involve structural elements that are essential for the stability and safety of the ramps, facilitating smooth traffic transitions between different levels. V.O.1 - Embankment For Ramp A-Abutment A1: Variation Order 1 (V.O.1) introduces an embankment work specifically for Ramp A and Abutment A1. Embankments are constructed to raise the roadway and provide necessary support to the structure, ensuring proper alignment with surrounding areas. V.O.2 and V.O.3 - Extra Over For Concrete, Formwork, and Staging: Variation Order 2 (V.O.2) and Variation Order 3 (V.O.3) address additional requirements for concrete, formwork, and staging. These elements are vital for the construction process, involving the preparation, placement, and support of concrete as well as temporary structures. The total budget allocated for this project is RM 11.6 Million. The project timeline spans from June 2005 to July 2006. Through these concerted efforts, Road Builder (M) Sdn Bhd and PTC contribute to the enhancement of infrastructure quality, road safety, and efficient traffic flow in the designated areas.